: Lintec Corp Protective Lining
Systems

301-832-7868

Connect with us
Project 1:

Underground piping inspection


Job Site- Pilgrim Nuclear Power Station, MA

Work Scope-

> Inspect the existing coating

> Identify problem coating

> Remove problem area (asbestos certified remover)

> Prep the pipe metal surface for UT

> Recoat the areas with new coating material

> Spark test the new repair areas



Pipe Inspection


Pipe Inspection